Factory-finished NOOK guest suite lit from within at dusk on open land — road-legal modular hospitality cabin. Visualization.
NOOK Cabins — modular hospitality suites

Factory-finished guest suites, craned into place in a day — taking bookings the same week.

For glamping operators, boutique hotels and landowners: architect-designed suites from 10 to 40 m², built across three production bases, guest-ready from €69,000 + IVA, all-in — with the payback math published.

Architect-designed suites, 10–40 m², guest-ready from €69,000 + IVA all-in. The payback math is published.

Visualization
3 production bases10–40 m² connected suitescraned in a dayguest-ready from €69,000 + IVAproposal in 48 hours
The numbers first

What a suite earns on your land.

+37%

Interior-Spain glamping low-season pricing, 2025. Bungalows: +1.8%.

Source — Capital.es
1 day

From crane arrival to a guest-ready suite. Flat-pack alternatives: 4–14 days of site assembly per unit.

Source — methodology on the delivery page
€58–94k

Modelled annual revenue per Studio at mature 75% occupancy — year one typically runs 35–50%.

Source — assumptions published in the calculator
The market's bad defaults

Flat-packs take crews and weeks.

Wide loads take permits and escorts.

Cheap pods take your nightly rate.

A NOOK arrives finished, road-legal, and earning.

+ IVA/VAT where applicable. Configured price for the stated specification; site works, utility runs and licences excluded and itemised in your proposal.

Why NOOK is different

One road-legal module. Any size of suite.

ORTHOGRAPHIC PLAN · not to scale 01 · one module road-legal width
01 — One module

Every module ships at road-legal width — no wide-load permits, anywhere.

ORTHOGRAPHIC PLAN · not to scale 02 · modules dock flush glazed junction
02 — The junction

Modules connect through a flush, full-height glazed junction — never a corridor, never a container look.

ORTHOGRAPHIC PLAN · not to scale 03 · one suite bedroom bath living
03 — The suite

Start with two. Add a suite each season. One foundation system, one aesthetic.

Guaranteed spec, in writing

Lenders read spec sheets, not adjectives. Ours is published — and guaranteed in the contract annex.

Walls 14 cm rock-wool insulation
Energy certification A
Ventilation MVHR heat-recovery
Glazing Double low-E
Structural warranty 3 years
Read the full specification annex →
A NOOK suite paired with its matched sauna at dusk — wellness amenity for hospitality. Visualization.
Wellness by NOOK

The amenity that books by the hour and lifts every rate on the property.

€25–55 Modelled per-session revenue per guest — assumptions on the wellness page.
↑ rate Wellness-led properties command measurably higher rates — sources on the wellness page.
Visualization
How it works

A proposal in 48 hours. A suite in 12–16 weeks.

01

Consultation

30 minutes, your land and your numbers.

02

Proposal

Configured price and layout, within 48 hours.

03

Viability

The 48-hour technical read of your site; your reservation deposit confirms the production slot.

04

Production

8–10 weeks in the factory. Fixed price, fixed date.

05

Install day

Craned into place in hours. Listed within days.

Permits, honestly — planning, building code and tourism licences are three different regulators, and which apply depends on your land. Our 48-hour viability read and per-region guides come before any contract.

How licensing works →
See it real

Watch a real install day. Visit a factory. Stay in a NOOK.

Install day, filmed uncut — in production
Factory floor — photography in production

Visit the factory

Three bases. Walk the line before you order.

Book a factory visit

Bring us a site and a plan. We'll bring the numbers.

Thirty minutes, your land or your property, a configured proposal within 48 hours.

What are you building?

So the right person picks up your enquiry.

Your site & scale

Enough to model your numbers and check your site.

How many units are you planning?
Where does your land stand?
Your timeline
Region
Your details

Where we send the proposal and the dossier.